1、Bidding Conditions
Overview:BIM Application Center Equipment Purchase Project of Guizhou Vocational and Technical College of Water Resources and Hydropower In Guizhou Vocational Development Program Financed By ADB Loan
Source of Funds:ADB Loan
Description of The Prepared Bidding Conditions:Preparation of bidding documents
2、Bidding Content
Bidding No:0708-1820070TJ015/01
Project Name:BIM Application Center Equipment Purchase Project of Guizhou Vocational and Technical College of Water Resources and Hydropower In Guizhou Vocational Development Program Financed By ADB Loan
Place of Implementation:Guizhou
List of Products:
NO. | Product Name | Quantity | Main Technical Data | Remarks |
1 | BIM5D | 76 | Delivery date:45 days after the contract comes into effect | Detailed list and requirements are detailed in the chapter 8 of the tender documents. |
2 | Formwork scaffolding design software | 76 | Delivery date:45 days after the contract comes into effect | |
3 | MagiCAD | 76 | Delivery date:45 days after the contract comes into effect | |
4 | Steel bar construction and bending software | 15 | Delivery date:45 days after the contract comes into effect | |
5 | BIM browser | 15 | Delivery date:45 days after the contract comes into effect | |
6 | BIM drawing review software | 15 | Delivery date:45 days after the contract comes into effect | |
7 | Building Construction Structure Simulation Training Exhibition Hall | 61 | Delivery date:45 days after the contract comes into effect | |
8 | Simulation training system for safe and civilized construction site | 61 | Delivery date:45 days after the contract comes into effect | |
9 | Building Construction Technology Simulation Drill Center | 61 | Delivery date:45 days after the contract comes into effect | |
10 | Comprehensive simulation drill system for construction engineering posts | 1 | Delivery date:45 days after the contract comes into effect | |
11 | Engineering drawing reading VR simulation training system | 1 | Delivery date:45 days after the contract comes into effect | |
12 | Building construction structure VR simulation training system | 1 | Delivery date:45 days after the contract comes into effect | |
13 | Building construction technology VR simulation training system | 1 | Delivery date:45 days after the contract comes into effect | |
14 | Building safety dynamic experience equipment | 1 | Delivery date:45 days after the contract comes into effect | |
15 | Construction engineering safety education VR system | 1 | Delivery date:45 days after the contract comes into effect | |
16 | Security co-broadcast display equipment | 1 | Delivery date:45 days after the contract comes into effect | |
17 | VR co-broadcast glasses and system | 6 | Delivery date:45 days after the contract comes into effect | |
18 | 6-person VR co-broadcast experience desks and chairs | 1 | Delivery date:45 days after the contract comes into effect | |
19 | VR training interaction equipment | 2 | Delivery date:45 days after the contract comes into effect | |
20 | VR supporting workstation (computer) | 2 | Delivery date:45 days after the contract comes into effect | |
21 | VR co-broadcast display | 2 | Delivery date:45 days after the contract comes into effect | |
22 | Desks and chairs for VR training equipment | 2 | Delivery date:45 days after the contract comes into effect | |
23 | light tower positioning display rack | 2 | Delivery date:45 days after the contract comes into effect | |
24 | Physical sand table of the real construction site | 1 | Delivery date:45 days after the contract comes into effect | |
25 | Electronic sand table teaching system | 1 | Delivery date:45 days after the contract comes into effect | |
26 | Sand table control host | 1 | Delivery date:45 days after the contract comes into effect | |
27 | Multimedia platform | 1 | Delivery date:45 days after the contract comes into effect | |
28 | Assembly type industrialization base physical sand table | 1 | Delivery date:45 days after the contract comes into effect | |
29 | Assembly type AR interaction platform | 1 | Delivery date:45 days after the contract comes into effect | |
30 | Assembly type AR teaching model | 1 | Delivery date:45 days after the contract comes into effect | |
31 | AR interaction teaching software | 1 | Delivery date:45 days after the contract comes into effect | |
32 | VR design platform software V3.0 | 5 | Delivery date:45 days after the contract comes into effect | |
33 | VR design platform software-BIM module +Revit plugin | 5 | Delivery date:45 days after the contract comes into effect | |
34 | VR software GLVR V3.0 | 5 | Delivery date:45 days after the contract comes into effect | |
35 | AR software GLAR V3.0 | 5 | Delivery date:45 days after the contract comes into effect | |
36 | BIMVR software BIMVR V3.0 | 5 | Delivery date:45 days after the contract comes into effect | |
37 | VR design platform cloud VDPCloud V3.0 | 3 | Delivery date:45 days after the contract comes into effect | |
38 | VR screen | 12 | Delivery date:45 days after the contract comes into effect | |
39 | BIMVR all-in-one unit | 1 | Delivery date:45 days after the contract comes into effect | |
40 | BIMVR distribution system | 1 | Delivery date:45 days after the contract comes into effect | |
41 | 3D glasses | 20 | Delivery date:45 days after the contract comes into effect | |
42 | 65" TV | 1 | Delivery date:45 days after the contract comes into effect | |
43 | Decoration iPad | 1 | Delivery date:45 days after the contract comes into effect | |
44 | Computer for design (BIM, VR design) | 1 | Delivery date:45 days after the contract comes into effect | |
45 | VR display computer | 1 | Delivery date:45 days after the contract comes into effect | |
46 | Virtual design AR interaction platform | 1 | Delivery date:45 days after the contract comes into effect | |
47 | VRP virtual design platform | 5 | Delivery date:45 days after the contract comes into effect | |
48 | Engineering center computer | 15 | Delivery date:45 days after the contract comes into effect | |
49 | Training certification computer | 122 | Delivery date:45 days after the contract comes into effect | |
50 | Server | 1 | Delivery date:45 days after the contract comes into effect | |
51 | Cabinet | 3 | Delivery date:45 days after the contract comes into effect | |
52 | GB switch | 5 | Delivery date:45 days after the contract comes into effect | |
53 | Water dispenser | 3 | Delivery date:45 days after the contract comes into effect | |
54 | Computer desk | 62 | Delivery date:45 days after the contract comes into effect | |
55 | Conference table | 1 | Delivery date:45 days after the contract comes into effect | |
56 | L-shaped position | 15 | Delivery date:45 days after the contract comes into effect | |
57 | Office table | 1 | Delivery date:45 days after the contract comes into effect | |
58 | Business sofa (for two persons) | 2 | Delivery date:45 days after the contract comes into effect | |
59 | Business sofa (for one person) | 14 | Delivery date:45 days after the contract comes into effect | |
60 | Coffee table | 3 | Delivery date:45 days after the contract comes into effect | |
61 | Cultural construction board | 30 | Delivery date:45 days after the contract comes into effect | |
62 | L-shaped teacher's desk | 1 | Delivery date:45 days after the contract comes into effect | |
63 | Cinema seat | 50 | Delivery date:45 days after the contract comes into effect | |
64 | Full-frequency professional sound box | 4 | Delivery date:45 days after the contract comes into effect | |
65 | Professional pure post level amplifier | 4 | Delivery date:45 days after the contract comes into effect | |
66 | Mixer | 4 | Delivery date:45 days after the contract comes into effect | |
67 | Wireless microphone | 4 | Delivery date:45 days after the contract comes into effect | |
68 | Power timing device | 4 | Delivery date:45 days after the contract comes into effect | |
69 | Spliced LCD | 12 | Delivery date:45 days after the contract comes into effect | |
70 | Large screen management software | 1 | Delivery date:45 days after the contract comes into effect | |
71 | Common projection screen | 1 | Delivery date:45 days after the contract comes into effect | |
72 | Common projector | 1 | Delivery date:45 days after the contract comes into effect | |
73 | Enterprise router | 4 | Delivery date:45 days after the contract comes into effect | |
74 | Overall scheme of large curved screen | 2 | Delivery date:45 days after the contract comes into effect | |
75 | HD recording and playing server | 1 | Delivery date:45 days after the contract comes into effect | |
76 | Teacher test panoramic camera | 1 | Delivery date:45 days after the contract comes into effect | |
77 | Student test panoramic camera | 1 | Delivery date:45 days after the contract comes into effect | |
78 | HD PTZ camera | 2 | Delivery date:45 days after the contract comes into effect | |
79 | Hanging microphone | 6 | Delivery date:45 days after the contract comes into effect | |
80 | Digital audio processor | 1 | Delivery date:45 days after the contract comes into effect | |
81 | Wireless portable head type microphone and wireless microphone | 1 | Delivery date:45 days after the contract comes into effect | |
82 | Full-frequency loudspeaking sound box | 1 | Delivery date:45 days after the contract comes into effect | |
83 | Visualized control terminal for recording and playing | 1 | Delivery date:45 days after the contract comes into effect | |
84 | Guide console | 1 | Delivery date:45 days after the contract comes into effect | |
85 | Micro-course control system | 1 | Delivery date:45 days after the contract comes into effect | |
86 | Recording and playing room tablet | 1 | Delivery date:45 days after the contract comes into effect | |
87 | Recording and playing room router | 1 | Delivery date:45 days after the contract comes into effect | |
88 | Centralized control and management platform | 1 | Delivery date:45 days after the contract comes into effect | |
89 | Resource management platform software | 1 | Delivery date:45 days after the contract comes into effect |
3、Qualification Requirements For Bidder
Qualifications or Performance:1) The average annual turnover of the bidder in the past three years (2015-2017), that is, the average annual turnover of the completed contract or the executing contract, shall not be less than RMB 17 million;
2) The bidder, as the supplier, has successfully completed at least three sales similar to this project since 2015, and the contract amount of one of them is not less than 6.5 million yuan (or foreign currency of the same price);
3) If the goods for bidding come from the outside of the territory of the People's Republic of China, the domestic bidder has the import and export certificate issued by the competent government department;
4) The Bidder should have ISO9001 series certifications or equivalent certificate;
5) If the Bidder comes come from the inside of the territory of the People's Republic of China, the bidder shall have the AAA qualification of enterprise credit rating and Class A enterprise certificate of tax payment credit;
6) The Bidder must demonstrate that it does not has a negative net value for three years (2015-2017) prior to the closing date of this tender
7) The Bidder must provide supporting document that proves that it has available sources of funds in addition to the advance payment under the Contract, such as current assets, barrier-free real estate, credit line and other financial resources, in order to meet the following requirements: The cash flow must be no less than 50% of the bidding quotation;
8) The total value of all outstanding financial claims, non-arbitrations or other proceedings of the Bidder must not exceed 50% of its net asset. The net asset of the Bidder is the difference between its total assets and total liabilities.
Joint Bids:NOT Available
Bid without the bidding documents:NOT Available
4、Acquisition of Bidding Documents
Beginning of Selling Bidding Documents:2018-12-27
Ending of Selling Bidding Documents:2019-01-04
Sell bidding?doc?online?or?not:No
To Obtain::On-site Purchase
Place:Room 2102B, No.1(W) Fuchengmenwai Avenue, Xicheng District, Beijing
Price of Bidding Documents:¥¥2000/$300/$300
Additional Instructions:Interested eligible Bidders can purchase bidding documents at the office of China National Machinery Import and Export Corporation. between 9:00 am-11:00 am, 1:30 pm-4:00 pm (Beijing Time) from Dec.27, 2018 to Jan.04, 2019 at the following address (weekends and holidays excluded). A complete set of Bidding Documents in Chinese and English version can be purchased by any interested eligible Bidder on the submission of a written application to the above and upon payment of non-refundable fee of CNY 2,000.00 or USD 300.00 per package. (In the event of any discrepancy between the English and the Chinese version, the Chinese version shall govern.)
5、Bid Submission
Deadline for Submitting Bids/Time of Bid Opening (Beijing Time):2019-01-17 09:30
Place of Bid:Multifunction room, the 3rd floor, West Wing of Sichuan Mansion, Xicheng District, Beijing
Place of Bid Opening:Multifunction room, the 3rd floor, West Wing of Sichuan Mansion, Xicheng District, Beijing
6、The bidder needs to register before the tender on www.chinabidding.com. And the evaluation results will be released on www.chinabidding.com.
7、Contact Details
Purchasers:Guizhou Vocational and Technical College of Water Resources and Hydropower
Add.:No. 1, Longjing Road, Western District of Qingzhen Vocational Education City, Guizhou
Contact:Sheng Wang, Xu Ding
Tel:0851-85925622
Bidding Agency:China National Machinery Import & Export Corporation
Add.:No.1(W) Fuchengmenwai Avenue, Xicheng District, Beijing
Contact:Ms. Tian, Mr. Zhao
Tel:010-68991564, 68991827;tianjia@cmc.genertec.com.cn; zhaoliangyin@cmc.genertec.com.cn;
8、Remittance Approach:
Bank(RMB):Business Department of Beijing Bank Head Office
Bank(USD):
Account NO.(RMB):01090520500120109187393
Account NO.(USD):
9、Additional Instruction
Site reconnaissance:Yes