1、Bidding Conditions
Overview:This project is the sewage pipe project from the mouth of Wuxi River to Fotang Pump Station; This project has two sub projects, the Fotang Sewage Treatment Plant Front Pumping Station (60000 tons/day) and the Dispatch Pumping Station (40000 tons/day), with a budget of 5.1 million RMB.
Source of Funds:Implemented
Description of The Prepared Bidding Conditions:Already possessed
2、Bidding Content
Bidding No:0837-2540CTFCYW10
Project Name:Integrated pumping station equipment for the sewage pipe project from Wuxi estuary to Fotang pumping station
Place of Implementation:Yiwu City, Zhejiang Province
List of Products:
NO. | Product Name | Quantity | Main Technical Data | Remarks |
1 | Integrated pumping station equipment | 1 seat | 60000m3/d,See the bidding documents for details | Selmer, Grundfos, Weile and other brands of the same level or above |
2 | Integrated pumping station equipment | 1 seat | 40000m3/d,See the bidding documents for details | Selmer, Grundfos, Weile and other brands of the same level or above |
3 | Supporting related equipment, electrical, and self-control | 1 batch | See the bidding documents for details |
3、Qualification Requirements For Bidder
Qualifications or Performance:1. The bidder has a third level or higher qualification for general contracting of mechanical and electrical engineering construction, and has a valid safety production license. A copy of the qualification certificate should be provided.
2. The bidder intends to appoint a project manager with a Level 2 or above Construction Engineer Registration Certificate in Mechanical and Electrical Engineering and a Class B Certificate for "Category III Personnel";
3. Propose to assign full-time safety production management personnel to the construction site, with a Class C certificate for "Class III Personnel";
4. Since January 1, 2020 (the time shall be subject to the signing time), the bidder has undertaken at least one integrated pump station supply performance in Chinese Mainland with a contract amount of no less than 2 million yuan (or equivalent foreign currency). Provide a copy of the contract and keep the original for future reference.
5. Provide an authorization letter from the integrated pump station equipment manufacturer for this project during bidding.
6. Any deviation from the terms stated in the first volume of the bidding documents that may result in the rejection of the bid will result in the rejection of the bid.
Joint Bids:NOT Available
Bid without the bidding documents:NOT Available
4、Acquisition of Bidding Documents
Beginning of Selling Bidding Documents:2025-06-13
Ending of Selling Bidding Documents:2025-06-20
Sell bidding?doc?online?or?not:No
To Obtain::On-site Purchase
Place:12/F, Block A, Zijin Plaza ,701 Gudun Road, Hangzhou City, Zhejiang Province
Price of Bidding Documents:¥800/$120
5、Bid Submission
Deadline for Submitting Bids/Time of Bid Opening (Beijing Time):2025-07-04 10:00
Place of Bid:1505, 15th Floor, Building A, Zijin Plaza, No. 701 Gudun Road, Hangzhou City, Zhejiang Province
Place of Bid Opening:1505, 15th Floor, Building A, Zijin Plaza, No. 701 Gudun Road, Hangzhou City, Zhejiang Province
6、Contact Details
Purchasers:Yiwu drainage Co., Ltd
Add.:No. 326 Shenzhou Road, Houzhai Street, Yiwu City, Zhejiang Province
Contact:Mr.zhao
Tel:0086-0579-83828570
Bidding Agency:Zhengjiang Province Complete Engineering Co.,Ltd.
Add.:12/F, Block A, Zijin Plaza ,701 Gudun Road, Hangzhou City, Zhejiang Province
Contact:Mr.sheng
Tel:0086-571-88951139
7、Remittance Approach:
Bank(RMB):
Bank(USD):
Account NO.(RMB):201000065548152
Account NO.(USD):1900510104000749